Governors Bay Jetty restoration
Governors Bay Jetty restoration
Barge in Governors Bay with a digger and workers aboard, refurbishing the earthquake-damaged jetty.
Contributors note: "This is the start of the rebuild of Governors Bay Jetty, taken in November 2022. Construction finished in July 2023 and the grand reopening of the jetty was on 30 September 2023."
Report this entry
More from the same area
Minions demonstrating bubble life
Minions in a plastic container by a letterbox along Harewood ...
Signs at Charity Hospital
Signs at Canterbury Charity Hospital including a sign assuring ...
Window to celebrate ANZAC day
Window decorated in house on Jennifer Street to celebrate ANZAC ...
Brooklands, The Shack Of Remembrance
The Shack Of Remembrance was built by two Brooklands locals and ...
ANZAC Day dawn remembrance
ANZAC Day dawn remembrance outside my home listening to Radio ...
Covid-19 lockdown precautions on Go Bus vehicle, #80 route
Most extensive Covid-19 signage & cautions I've seen on a Chch ...
Manchester St super-stop converts to temporary bus exchange for Covid-19 L4 lockdown
Central Bus Exchange closed as part of ECan's Covid-19 health & ...
Colombo Street under L4 lockdown - empty except for the accumulating autumn leaves
Bus stop #14974 outside South City Shopping Centre, during ...
Learning new art/craft techniques during lockdown
Having no visitors during L4 lockdown has provided some time to ...
Trying new things during L4 lockdown: Kitchen mad science!
Joining the Lockdown National Bake-off trend, I've been ...
No lockdown loitering (at any distance)
Outdoor seating areas at Merivale Mall are very thoroughly ...