Governors Bay Jetty restoration
Governors Bay Jetty restoration
Barge in Governors Bay with a digger and workers aboard, refurbishing the earthquake-damaged jetty.
Contributors note: "This is the start of the rebuild of Governors Bay Jetty, taken in November 2022. Construction finished in July 2023 and the grand reopening of the jetty was on 30 September 2023."
Report this entry
More from the same area
The reality of working from home
A sign on the door to let the kids know not to disturb Dad while ...
Flowering Succulent on the sand dunes
A beautiful flower brightens the sand dunes at New Brighton ...
Barbed wire framing the Port Hills
Artistic photo of some barbed wire with the Port Hills in the ...
Covid Testing Centre - Christchurch Central
COVID-19 Testing station for GP referrals only.
The moon over New Brighton beach
The moon creates a beautiful atmosphere at New Brighton beach.
Graffiti on Manchester Street
On stone seats by Manchester St super stop going north.
Graffiti on Manchester Street
On stone seats by Manchester street super stop going north.
Benjamin and Fionn outside the library
"When we came to photography school Benjamin and Fionn went ...
In the car in cathedral square
"Driving" - Contributor's note
Taken through the cab of the ...
Phone Call on Worcester Street
"On a phone call" - Contributor's note
Taken from the ...
Bee On Cherry Blossom Tree
"Showing off the wonderful nature in Christchurch with this ...