New Brighton beach restoration

9 October 2025

New Brighton beach restoration

9 October 2025

Digger working on New Brighton Beach heaping sand to expand the dune further onto the beach to manage the coastline erosion.

Contributors note: "New Brighton Pier with a digger working on sand dune restoration. 09/10/25"

Creator: Lucie Lewington

Contributor: Lucie Lewington

Source: Entry in the 2025 Christchurch City Libraries Photo Hunt.

Reference ID: CCL-PH25-LuLe-0003

Uploaded by: CCL Photo Hunt

CC BY-NC-ND 4.0

This material has been provided for private study purposes (such as school projects, family and local history research) and any published reproduction (print or electronic) may infringe copyright law. Please contact Christchurch City Libraries if you have any questions relating to the use of this material or wish to order a hi resolution copy for commercial purposes. It is the responsibility of the user to obtain clearance from the copyright holder.

Comments

Add a comment
Thank you. Your comment has been saved and queued for moderation.

Report this entry

Please enter your details and we'll contact you for more information.

Thank you for your report

More from the same area

The Sumner seawall footpath covered in rocks

25 July 1978

The footpath along the Sumner seawall, from Cave Rock to ...

Erosion of Sumner Surf Club car park

21 February 1980

Council workers building a rockwall to prevent further erosion ...

Vanishing sandhills at Sumner

15 November 1977

Sandhills at Sumner, showing the effect of tidal erosion.

March Construction hauling up the Sumner pier piles

6 November 1980

March Construction machinery using a vibrahammer extractor to ...

The Sumner to Taylors Mistake walkway

11 January 1977

Looking towards Sumner from the Scarborough Track above ...

Repairing the damage to the Sumner waterfront

29 July 1954

A bulldozer is used to repair the damaged waterfront on the ...

Sumner village shops

30 June 1966

Shops on on Wakefield Avenue, Sumner.

Hanging in a cage 85ft above Scarborough Road

22 August 1967

E.D. Beckwith and N.H. Harris inspecting the face of Scarborough ...

Sumner after the sea broke through in 1953

22 April 1958

Damage to seawall at Sumner.

Rips at North Beach

24 December 1979

Aerial view of North Beach showing the dangerous places to swim.

Rips at Spencer Park

24 December 1979

Aerial view of Spencer Park beach showing where the rip is.

Old trams at Waikuku Beach

Circa 1950s

Old trams at a Waikuku Beach holiday camp run by the ...

New Brighton pier and swings

24 August 1963

A swingset on New Brighton beach. Behind is New Brighton pier.

Woodend Beach

27 December 1980

Woodend Beach looking south towards Banks Peninsula.

Jim Diack, beach patrolman

13 January 1975

Jim Diack, beach patrolman, with a golden labrador sitting in ...

McCormacks Bay

14 June 1962

View from McCormacks Bay of the Avon-Heathcote Estuary.

Foreshore - South Brighton to Waimari

28 November 1970

Driftwood on the beach between South Brighton and Waimairi.

Rips at Waimairi Beach

24 December 1979

Aerial view of Waimairi Beach, showing rips.

Baches at Taylors Mistake

9 October 1985

Baches at Taylors Mistake, with the beach carpark in the ...

Tony Smoor and beach equipment

14 December 1984

Tony Smoor with beach equipment for hire at New Brighton.

Summer Madness in the Square

22 June 1985

University students dressed in beach clothing in June in ...

Tern Street signpost on New Brighton beach

7 October 1970

Sign post on New Brighton beach indicating where Tern Street ...

Reducing Sand Dunes

27 September 1991

Excavator reducing the size of a sand dune near Marine Parade.

Search/Browse the collection