Governors Bay Jetty restoration
Governors Bay Jetty restoration
Barge in Governors Bay with a digger and workers aboard, refurbishing the earthquake-damaged jetty.
Contributors note: "This is the start of the rebuild of Governors Bay Jetty, taken in November 2022. Construction finished in July 2023 and the grand reopening of the jetty was on 30 September 2023."
Report this entry
More from the same area
Inspection of damaged lines
Municipal Electricity Department engineering officer, Brian ...
Retirement from MED
Municipal Electricity Department secretary, Allen Mintrom, with ...
Removal of stuck kite
Municipal Electricity Department lineman, Jock McGill removes a ...
Linemen training school
G. Kitchihngham, S. Chapman and K. Berryman at linemen training ...
Electrical unit unloaded at Lyttelton
An electrical unit being unloaded at Lyttelton, destined for ...
A fault in an underground cable
Workers from the Municipal Electricity Department carrying out ...
Erection of spun concrete poles in Lyttelton Street
The first spun concrete poles made in the South Island being ...
South Canterbury Electric Power Board builidng
The new administative building for the South Canterbury Electric ...
Linemen reclaiming a cable on Lincoln Road
Linemen reclaiming an electricity cable in Lincoln Road for use ...
Exposed offices in the ANZ Bank building.
Exposed offices in the ANZ Bank building Colombo Street.
Exposed offices in the ANZ Bank building.
Exposed offices in the ANZ Bank building Colombo Street.
Partly collapsed Smith City building with roof parking
Partly collapsed Smith City building with roof parking on ...
Catholic Cathedral (Cathedral of the Blessed Sacrament)
The damaged Catholic Cathedral (Cathedral of the Blessed ...