Governors Bay Jetty restoration
Governors Bay Jetty restoration
Barge in Governors Bay with a digger and workers aboard, refurbishing the earthquake-damaged jetty.
Contributors note: "This is the start of the rebuild of Governors Bay Jetty, taken in November 2022. Construction finished in July 2023 and the grand reopening of the jetty was on 30 September 2023."
Report this entry
More from the same area
The Church in Christchurch Meeting Hall
The Church in Christchurch Meeting Hall, 103 Mathers Road, Hoon ...
The Church in Christchurch Meeting Hall
The Church in Christchurch Meeting Hall, 103 Mathers Road, Hoon ...
Hoon Hay Presbyterian Church
Hoon Hay Presbyterian Church at 5 Downing St in Hillmorton.
Building of Tūranga, Central Library in Cathedral Square
Construction of Tūranga, the Central Library, beside Novotel ...
Building of Tūranga, Central Library in Cathedral Square
Construction of Tūranga, the Central Library in Cathedral ...
Part of the collapsed ChristChurch Cathedral
Part of the collapsed ChristChurch Cathedral
Part of the collapsed ChristChurch Cathedral
Part of the collapsed ChristChurch Cathedral
Part of the collapsed ChristChurch Cathedral
Part of the collapsed ChristChurch Cathedral
Building of Tūranga, Central Library in Cathedral Square
Construction of Tūranga, the Central Library in Cathedral ...
Pumping Pavilion, Oxford Terrace and Bangor Street
Bangor Street No. 3 Pump House on Oxford Terrace.
Pumping Pavilion, Oxford Terrace and Bangor Street
Bangor Street No. 3 Pump House on Oxford Terrace.
Banks of the Avon River, Cambridge Terrace
Toetoe on the banks of the Avon River on Cambridge Terrace.