Last pile set for new private hospital expansion
Last pile set for new private hospital expansion
Montage of images showing the final pile being set into the ground for the Forté Health hospital on Kilmore Street.
Contributors note: "This is the last pile for this construction site for another Fortehealth building. The crew were Andrew, Cody and Julian."
Report this entry
More from the same area
The Church in Christchurch Meeting Hall
The Church in Christchurch Meeting Hall, 103 Mathers Road, Hoon ...
The Church in Christchurch Meeting Hall
The Church in Christchurch Meeting Hall, 103 Mathers Road, Hoon ...
Hoon Hay Presbyterian Church
Hoon Hay Presbyterian Church at 5 Downing St in Hillmorton.
Building of Tūranga, Central Library in Cathedral Square
Construction of Tūranga, the Central Library, beside Novotel ...
Building of Tūranga, Central Library in Cathedral Square
Construction of Tūranga, the Central Library in Cathedral ...
Part of the collapsed ChristChurch Cathedral
Part of the collapsed ChristChurch Cathedral
Part of the collapsed ChristChurch Cathedral
Part of the collapsed ChristChurch Cathedral
Part of the collapsed ChristChurch Cathedral
Part of the collapsed ChristChurch Cathedral
Building of Tūranga, Central Library in Cathedral Square
Construction of Tūranga, the Central Library in Cathedral ...
Pumping Pavilion, Oxford Terrace and Bangor Street
Bangor Street No. 3 Pump House on Oxford Terrace.
Pumping Pavilion, Oxford Terrace and Bangor Street
Bangor Street No. 3 Pump House on Oxford Terrace.
Banks of the Avon River, Cambridge Terrace
Toetoe on the banks of the Avon River on Cambridge Terrace.