Christchurch Town Hall
Christchurch Town Hall
Christchurch Town Hall the night before opening for the public weekend.
The Town Hall reopened on the 23 February 2019 after repairs resulting from the February 2011 earthquake.
The first public access to the repaired complex was on Saturday 23 February and Sunday 24 February 2019 at which time the Douglas Lilburn Auditorium, the Avon Room, formerly the Boaters Restaurant, and the Limes Room were completed. The James Hay Theatre is scheduled to reopen in April, the CSO's new headquarters will be complete in May and the whole complex will be restored by August.
Report this entry
More from the same area
Gloucester Street with surrounding buildings.
View of Gloucester Street, looking west, with intersection with ...
View of Gloucester Street
View of Gloucester Street and surrounding buildings, looking ...
New Regent Street and Armagh Street buildings
View over the rooftops of New Regent Street, with Armagh Street ...
Gloucester Street and surrounding buildings
Looking north west over Gloucester Street buildings from above ...
North of Gloucester Street
View from above Cathedral Junction, looking north west over ...
MFL building and carpark
Closeup of the MFL building (corner of Gloucester and Colombo ...
Victoria Apartments and Forsyth Barr building
Closeup of Victoria Apartments and the Forsyth Barr building. ...
Construction of Pacific Tower, Gloucester Street.
Beams lifted into place by a crane at the construction of ...
Construction of Pacific Tower, Gloucester Street.
Beams lifted into place by a crane at the construction of ...
Construction of Pacific Tower, Gloucester Street.
Beams lifted into place by a crane at the construction of ...
Floral procession Skellerup float
Skellerup float at the floral procession travelling along Armagh ...
Floral procession International Harvester float
The International Harvester float in the floral procession along ...