February 2017
The wall linings were removed before the Vicarage earthquake ...
February 2017
The wall linings were removed before the Vicarage earthquake ...
February 2017
The wall linings were removed before the Vicarage earthquake ...
February 2017
The wall linings were removed before the Vicarage earthquake ...
June 2017
The Vicarage was lifted by a dozen jacks, bolted to steel beams, ...
June 2017
The Vicarage was lifted by a dozen jacks, bolted to steel beams, ...
June 2017
These skates made the Vicarage slide on steel tracks, and onto ...
June 2017
The Vicarage was lifted by a dozen jacks, bolted to steel beams, ...
September 2017
Materials for the new engineered foundations for the Vicarage.
September 2017
Materials for the new engineered foundations for the Vicarage.
September 2017
Concrete poured on the Vicarage new foundations.
September 2017
New foundations for the Vicarage.
November 2017
The Vicarage was moved back on its new foundations.
November 2017
Moving the Vicarage back on its new foundations
February 2017
Moving the Vicarage we uncovered several layers of paint.
March 2018
Sprinklers were installed to ensure the Vicarage is going to be ...
March 2018
The stairs, damaged by the fire, have been carefully restored.
March 2018
The east window, damaged by the fire, has been carefully ...
5 May 2019
Christchurch Cathedral Choristers.
Who perform in the ...
4 April 2019
Christchurch cathedral chorister’s who sing in the ...
26 May 2019
Cousins sliding at the Margaret Mahy playground.
7 June 1988
Auctioneer, Mr David Rankin, with some of the items up for ...
2 September 1983
Reception area of The Building Centre at 211 Cashel Street, ...
Search/Browse the collection