Stronger foundations

September 2017

Stronger foundations

September 2017

Materials for the new engineered foundations for the Vicarage.

Creator: St Luke's Vicarage

Area: Central City / Central Christchurch - East

Reference ID: CCL-DW-83361

Uploaded by: St Luke's Vicarage

Copyright status: In copyright

This work is licensed under a Creative Commons Attribution-Noncommercial-Share Alike 4.0 International License Creative Commons License

This material has been provided for private study purposes (such as school projects, family and local history research) and any published reproduction (print or electronic) may infringe copyright law. Please contact Christchurch City Libraries if you have any questions relating to the use of this material or wish to order a hi resolution copy for commercial purposes. It is the responsibility of the user to obtain clearance from the copyright holder.

Comments

Add a comment
Thank you. Your comment has been saved and queued for moderation.

Report this entry

Please enter your details and we'll contact you for more information.

Thank you for your report

More from the same area

The Vicarage insides

February 2017

The wall linings were removed before the Vicarage earthquake ...

The Vicarage insides

February 2017

The wall linings were removed before the Vicarage earthquake ...

The Vicarage insides

February 2017

The wall linings were removed before the Vicarage earthquake ...

The Vicarage insides

February 2017

The wall linings were removed before the Vicarage earthquake ...

Lifting the Vicarage

June 2017

The Vicarage was lifted by a dozen jacks, bolted to steel beams, ...

Moving the Vicarage

June 2017

The Vicarage was lifted by a dozen jacks, bolted to steel beams, ...

Moving the Vicarage

June 2017

These skates made the Vicarage slide on steel tracks, and onto ...

Moving the Vicarage

June 2017

The Vicarage was lifted by a dozen jacks, bolted to steel beams, ...

Moving the Vicarage

June 2017

The Vicarage was lifted and pulled away from its original ...

Stronger foundations

September 2017

Materials for the new engineered foundations for the Vicarage.

Stronger foundations

September 2017

Concrete poured on the Vicarage new foundations.

Stronger foundations

September 2017

New foundations for the Vicarage.

Moving it back

November 2017

The Vicarage was moved back on its new foundations.

Moving it back

November 2017

Moving the Vicarage back on its new foundations

Hidden colours

February 2017

Moving the Vicarage we uncovered several layers of paint.

New sprinklers

March 2018

Sprinklers were installed to ensure the Vicarage is going to be ...

New stairs

March 2018

The stairs, damaged by the fire, have been carefully restored.

East window restored

March 2018

The east window, damaged by the fire, has been carefully ...

Christchurch Cathedral Choristers

5 May 2019

Christchurch Cathedral Choristers.
Who perform in the ...

Christchurch Cathedral Choristers

4 April 2019

Christchurch cathedral chorister’s who sing in the ...

Slide

26 May 2019

Cousins sliding at the Margaret Mahy playground.

The Winter Garden Sapphire Room auction

7 June 1988

Auctioneer, Mr David Rankin, with some of the items up for ...

Building Centre on Cashel Street

2 September 1983

Reception area of The Building Centre at 211 Cashel Street, ...

Search/Browse the collection