Christchurch waste water 3km ocean outfall during construction

Christchurch waste water 3km ocean outfall during construction
A shaft sunk in the dunes in South Brighton during the construction of the 3km ocean outfall in 2008. The pipeline officially went into use in March 2010.
Report this entry
More from the same area
Children in costumes
Two unidentified children in costumes standing in the backyard ...
Live band performance at New Brighton during the first winter fireworks
This was the first time the annual public fireworks event at New ...
Driftwood construction with the New Brighton winter fireworks venue in the background
This was the first time the annual public fireworks event at New ...
New Brighton Pier construction
The New Brighton Pier soon after construction had started. This ...
Moon Wah Chinese Takeaway menu
Menu board at Moon Wah Chinese Takeaway on Bower Avenue.
Bulkhead installation
My son took this photo when the bulkhead was being installed in ...
Bulkhead being installed
My son took this photo when the bulkhead was being installed in ...
Installation of bulkhead
My son took this photo when the bulkhead was being installed in ...
Installation of bulkhead underwater
My son took this photo when the bulkhead was being installed in ...
Raymond Comfort and friends
In the sandhills at the end of Jervois Street. South Brighton, ...