Offshore barge and markers for the laying of the 3km ocean outfall pipeline.
Offshore barge and markers for the laying of the 3km ocean outfall pipeline.
Markers on shore guide the barge during the laying of the 3km wastewater ocean outfall. The pipe was tunneled under Jellicoe South Brighton and under the dunes.
Report this entry
More from the same area
Children in costumes
Two unidentified children in costumes standing in the backyard ...
Live band performance at New Brighton during the first winter fireworks
This was the first time the annual public fireworks event at New ...
Driftwood construction with the New Brighton winter fireworks venue in the background
This was the first time the annual public fireworks event at New ...
New Brighton Pier construction
The New Brighton Pier soon after construction had started. This ...
Moon Wah Chinese Takeaway menu
Menu board at Moon Wah Chinese Takeaway on Bower Avenue.
Bulkhead installation
My son took this photo when the bulkhead was being installed in ...
Bulkhead being installed
My son took this photo when the bulkhead was being installed in ...
Installation of bulkhead
My son took this photo when the bulkhead was being installed in ...
Installation of bulkhead underwater
My son took this photo when the bulkhead was being installed in ...
Raymond Comfort and friends
In the sandhills at the end of Jervois Street. South Brighton, ...